MIRO: Planning
Tasks (to do and in progress)
January 2006
- Applications:
interviews of partners (Digisens, Ausonius). Identification of needs
ARTIS, IPARLA (Jean-Dominique Gascuel-Xavier Granier).
- Extension of levels of detail for legible rendering:
Definition of criterion for the selection of levels of detail. First platform prototype with the new styles developed.
ARTIS, IPARLA (Matthew Kaplan - Xavier Granier)
- Sketching with strokes (Simplification):
case of building facades : adding more control to the LOD generation.
ARTIS, IPARLA (thesis)
- Volumetric rendering:
data acquisition : extraction of volumetric and surface data.Matching between volumetric and surface data. ARTIS. (internship)
- Rendering with marks:
analysis/synthesis of strokes patterns.
ARTIS (Pascal Barla PhD thesis with Lee Markosian).
- Rendering with marks:
Temporal coherence for mark-based rendering. A first method in object space.
ARTIS (David Vanderhaeghe).
March 2006
Prototypes realized. Test of various stylization.
- Application to archeology:
visualization of Maximus circus (Ausonius) ; integration of NPR techniques, test of LODs
- Sketching with strokes (Extraction):
proposal of a method for the extraction of feature lines from smooth objects (image / object space + particular cases). Development of a first prototype.
- Sketching with strokes (Simplification):
generic LODs system. Generalization of LODs techniques for the feature lines extracted from images.
- Rendering with marks:
Temporal coherence for mark-based rendering. Adding various styles of strokes. ARTIS (David Vanderhaeghe thesis, Hedlena Bezerra ARTIS).
- Volumetric rendering:
conclusion on tests and preparation for an implementation.
- Watercolor rendering:
adding more abstraction and LOD to the already developed algorithm. Adding more temporal coherence. (Adrien Bousseau master ARTIS).
June 2006
Validation ; cognitive sciences.
- Extension of levels of detail for legible rendering:
platform delivered
everyone
Planning 2005-2006
February 2006
3rd meeting
Prototypes fully
implemented, specific application for partners delivered (Digisens, Ausonius)...
September 2006
4rt meeting
January 2007
Last meeting, cloture